Vidéo

Maison Vidéo

Role of installation tools for PVC flooring

Role of installation tools for PVC flooring

Mar 18, 2024

Floor laying tools 1- Glue scraper:

Used to apply and scrape the glue so that it is evenly spread over the floor.

Tool 2 - Cutting knife: Used to cut the edges of the floor and the overlap of the two floor joints.

Tool 3 - Steel roller device: After the floor has been glued, the 50kg steel roller is used to roll the floor evenly and reinforce the floor.

Tool 4 - Grooving tool: grooving along the joints with the grooving tool to make the weld strong, grooving depth of 2/3 of the thickness of the floor.

Tool 5- Welding gun: The temperature of the welding gun should first be set at about 350 degrees.two-floor

Then, at the appropriate welding speed (to ensure that the welding rod melts), press the welding rod evenly into the groove.

Tool 6- Spatula: When the electrode has cooled down completely, use the spatula to cut away any remaining protrusions from the electrode.

WUXI TEFA DECORATION MATERIAL CO., LTD.

Ajouter : No.5 Huaqing Intelligent Park, Huishan District, Wuxi, Jiangsu, China

Tél : +86 18751567592

E-mail : web@topvcfloor.com

Subscribe

Please read on, stay posted, subscribe, and we welcome you to tell us what you think.

Soumettre
Facebook Youtube Linkedin Pinterest Twitter

droits d\'auteur © 2024 WUXI TEFA DECORATION MATERIAL CO., LTD. Tous droits réservés. Plan du site | Blog | Xml | Privacy Policy Réseau pris en charge

Maison

Des produits

contact

À propos